Engineered specifically for public parking lot projects, featuring high durability, dynamic load balancing, and smart payment integration.
The global transition toward electric mobility is rapidly shifting from early-adopter residential charging to massive public infrastructure expansion. Public parking lots, including municipal spaces, shopping malls, airports, transit hubs, and commercial office complexes, represent the most critical nodes in this new energy network. Turnkey charging station projects are emerging as the preferred execution model for property owners, municipal governments, and fleet operators. Rather than sourcing fragmented components, stakeholders require fully integrated, end-to-end solutions that cover grid connection, hardware installation, software management, and maintenance.
Developing EV charging infrastructure in public parking environments involves complex challenges: variable power grid capacities, zoning regulations, user payment security, and continuous maintenance. A turnkey project approach solves these pain points by offering a unified workflow. From site assessment and utility coordination to deploying advanced DC fast chargers and cloud-based management platforms, turnkey solutions minimize downtime and accelerate return on investment (ROI). Integrating hardware like our 360KW-720KW Split Type DC Fast Charging Stations allows operators to serve multiple vehicles simultaneously, scaling power distribution dynamically based on real-time vehicle demand.
Advanced load management systems ensure stations dynamically adjust power delivery to prevent grid overload during peak hours.
Integrated payment solutions support RFID, mobile apps, and credit cards, turning parking spaces into profitable assets.
IP54-rated enclosures and comprehensive electrical protections guarantee reliable operation in extreme outdoor conditions.
As the EV market matures, the technical requirements for public parking charging stations are evolving. Operators are shifting away from standalone AC chargers toward high-power DC charging networks integrated with local energy storage systems. Key industrial trends shaping the future of public parking charging infrastructure include:
One of the most significant advancements is the integration of solar photovoltaics and battery energy storage systems (BESS) directly with EV charging piles. Public parking lots offer expansive roof spaces (carports) ideal for solar panels. By storing solar energy in 100KWh or 200KWh battery systems, operators can offset peak demand charges from the grid, supply clean energy to vehicles, and even provide back-up power during outages. Our Integrated Charging Pile with 100KWh & 200KWh Energy Storage is designed to meet this demand, offering an all-in-one microgrid solution.
Deploying dozens of high-power chargers in a single parking structure can easily strain building electrical systems. Open Charge Point Protocol (OCPP 1.6J / 2.0.1) compliance allows operators to connect hardware to cloud monitoring software. This enables dynamic load balancing—automatically distributing available power among active vehicles based on priority, state of charge, and departure times. This prevents exceeding municipal power limits, avoiding costly grid upgrades.
To maximize vehicle turnover in busy public spaces, high-power DC chargers (ranging from 120KW to 360KW and up to 720KW) are replacing slow AC chargers. Split-type configurations allow the heavy power modules to be housed in a centralized utility cabinet, while small, user-friendly satellite dispensers (guns) are positioned at the parking bays. This architecture saves space, reduces noise at the parking bay, and optimizes thermal management.
The company owns more than 50 intellectual property rights, including invention patents, design patents, utility model patents and software copyrights for AC/DC charging systems and cloud service platforms. We hold ISO9001, CQC, CE, CB and UL certifications. Our commitment to strict quality control processes ensures that all hardware deployed in public environments meets international safety and efficiency standards.






EV charging needs vary significantly depending on the specific type of public parking facility. A successful turnkey project must tailor its hardware configuration and software features to match user dwell times and site constraints.
In retail parking spaces, the average dwell time ranges from 1 to 3 hours. A combination of 22KW AC chargers and 60KW to 120KW DC fast chargers is ideal. AC chargers provide a steady top-up for visitors planning longer stays, while DC chargers offer rapid charging for quick shoppers. The integration of advertising screens on the charging units opens up new marketing channels for retailers, allowing them to run promotions and generate additional ad revenue.
Transit hubs like airports, train stations, and park-and-ride facilities see vehicles parked for extended periods (8 to 24+ hours) alongside high-turnover taxi and ride-sharing fleets. Here, split-type DC fast charging systems (up to 720KW) are deployed to rapidly service commercial fleets, while energy-efficient AC chargers handle long-term commuter vehicles. Implementing smart scheduling ensures vehicles are fully charged right before their owners return, reducing peak grid load.
Office parks require robust infrastructure to support employees' vehicles during 8-hour workdays. Dual-gun wallbox or floor-mounted AC chargers (7KW to 21KW) are the most cost-effective solution here. By utilizing dynamic load management, office parks can maximize the number of active charging points without upgrading their main building transformers. Employee authentication via RFID or corporate mobile apps ensures secure access control.
For municipal, delivery, or utility fleets parked overnight in centralized lots, turnkey projects focus on high-power, automated DC charging. Heavy-duty 180KW to 360KW chargers ensure that large commercial vans and buses are charged and ready for operation by morning. The charging cycles are managed via centralized software to prioritize vehicles based on their scheduled departure times and route lengths.
Your trusted partner for global turnkey EV charging projects, delivering end-to-end manufacturing and R&D excellence.
Explore our full selection of AC and DC fast chargers certified for global turnkey projects in public and commercial parking lots.