High-efficiency power solutions optimized for public parking environments and rapid deployment.
The rapid transition toward electric mobility has shifted from a visionary trend to a concrete commercial reality. As global governments mandate decarbonization goals and automotive manufacturers phase out internal combustion engines, the demand for robust public charging networks is surging. At the center of this transition is the Level 3 EV Charger (also known as DC Fast Charger or DCFC). For public parking lots, retail shopping centers, and municipal hubs, installing these high-power charging stations is no longer just an environmental gesture—it is a critical driver of foot traffic, dwell-time monetization, and long-term asset appreciation.
Unlike Level 2 AC chargers that require hours to fill a battery, Level 3 DC chargers bypass the vehicle's onboard converter to supply high-voltage direct current directly to the battery. This cuts charging times down to 15–30 minutes, matching the natural dwell time of public parking lots.
Developing a charging station project involves complex engineering, utility negotiations, civil works, and software configuration. A turnkey project approach streamlines this process, delivering a fully operational, integrated system from design to commissioning.
Public parking lots represent the ideal intersection of daily vehicle storage and grid accessibility. Municipalities, property management firms, and commercial developers are rapidly implementing turnkey charging station projects. These projects leverage Level 3 charging systems to offer fast top-ups for commuters, fleet operators, and long-distance travelers. Key market drivers include government funding initiatives (such as the NEVI program in the US and AFIR regulations in Europe) which subsidize up to 80% of installation costs, drastically improving the return on investment (ROI) for operators.
Explore our diverse range of high-performance electric vehicle charging solutions.




Executing a successful public charging station requires more than just purchasing hardware. A true turnkey project handles the entire lifecycle of the installation, ensuring compliance, safety, and rapid deployment. Understanding the key stages of a turnkey project is vital for commercial property owners looking to transition smoothly into the electric era.
The first step in any turnkey project is a thorough analysis of the site's electrical capacity. Level 3 DC fast chargers require substantial power—often ranging from 60kW to over 360kW per unit. Turnkey partners evaluate existing transformer capacity, coordinate with local utility companies for grid upgrades if necessary, and design optimal layouts to maximize parking bay utilization while minimizing trenching costs.
Once the design is finalized, civil engineering begins. This involves trenching, running heavy-duty conduits, pouring concrete pads for the heavy chargers, and installing physical protection such as bollards and clear wheel stops. Simultaneously, operators select the appropriate hardware. For public parking lots, integrated DC charging piles with dual guns are highly recommended, as they allow two vehicles to charge simultaneously, maximizing throughput and utility.
Modern public charging projects rely heavily on smart software. Through OCPP (Open Charge Point Protocol) integration, chargers connect to cloud-based management systems. This enables operators to set dynamic pricing models (peak vs. off-peak), monitor charger health in real-time, execute remote diagnostic resets, and integrate seamless payment gateways (RFID, mobile apps, credit card readers) to ensure an effortless user experience.
Factory Area
Annual Capacity
Exporting Countries
The versatility of Level 3 EV Chargers allows them to be deployed across various public parking environments, each with unique operational demands and user expectations.
Shoppers typically spend 45 to 90 minutes at retail centers. By deploying 60kW to 180kW DC fast chargers, properties can offer a substantial charge during a standard shopping trip. Integrating advertising screens (like our 32-inch advertising model) generates secondary revenue through local media and brand partnerships.
Cities are installing public charging hubs to support residents who lack private driveways or home charging options. These installations require highly durable, weather-resistant (IP54/IP55) charging piles that feature user-friendly payment interfaces and strict safety protections against vandalism and electrical faults.
For commercial delivery fleets, ride-sharing hubs, and logistics providers, time is money. Split-type DC fast charging systems are highly effective here. By placing a high-power central cabinet in a utility area and distributing thin satellite charging terminals to the parking bays, fleet operators can charge multiple vans or trucks simultaneously under smart power-sharing algorithms, optimizing grid usage and vehicle turnaround.
We offer over 80 models of AC and DC chargers that meet global automotive-grade standards and regulatory certifications.




As the EV ecosystem matures, several key technological advancements are shaping the design and implementation of public charging projects. Staying ahead of these trends ensures that today's infrastructure investments remain viable for decades.
While 50kW was once considered fast, current standards are shifting toward 180kW, 360kW, and even 720kW split-type architectures. Vehicles with 800V architectures can now accept extreme power levels, allowing them to add hundreds of miles of range in under 10 minutes. Turnkey projects must utilize modular, upgradable power cabinets to support these upcoming vehicle technologies.
To avoid high demand charges from local utility companies during peak hours, modern turnkey charging stations are increasingly integrating local energy storage systems (ESS) and solar canopies. These systems store solar energy or cheap off-peak grid power and discharge it during peak fast-charging sessions, stabilizing the local grid and reducing operating costs.
Bi-directional charging will soon allow parked EVs to act as distributed energy resources, feeding power back to the grid or the host facility during peak demand. Turnkey software platforms are evolving to manage these dynamic interactions, transforming public parking lots from simple power consumers into active, grid-balancing power hubs.
Explore our full line of AC and DC charging stations certified for global deployment.